Downtown Sanitary Sewer Rehabilitation

In general, the project consists of Closed Circuit Television Inspection (CCTV), cleaning, and rehabilitation of the existing gravity sewer system from 6”-12” diameter and 98 manholes
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 - PFI-25971.02 670.6 KB
Addendum No. 2 - PFI-25971.02 946.3 KB